Place of Origin: | China |
Brand Name: | CEC TANKS |
Certification: | ISO 9001:2008, AWWA D103 , OSHA , BSCI |
Model Number: | W |
Minimum Order Quantity: | 1set |
Price: | $5000~$20000 one set |
Packaging Details: | PE poly-foam between each two steel plates ; wooden pallet and wooden |
Delivery Time: | 10-30 days after deposit received |
Payment Terms: | L/C, T/T |
Supply Ability: | 60 sets per month |
Detail Information |
|||
Place of Origin | China | Brand Name | CEC TANKS |
---|---|---|---|
Certification | ISO 9001:2008, AWWA D103 , OSHA , BSCI | Model Number | W |
Steel Plates Thickness: | 3mm To 12mm , Depends On The Tank Structure | Hardness: | 6.0Mohs |
Foundation: | Concrete Or Glass Fused Steel | Chemical Resistance: | Excellent |
Size Of Panel: | 2.4M * 1.2M | Acid And Alkalinity Proof: | Standard Coating Suits For PH3 - PH11, Special Coating Suits For PH1 - PH14 |
Easy To Clean: | Smooth, Glossy, Inert, Anti-adhesion | High Light: | fire fighting water tank,fire protection water storage tanks |
Vitreous Enamel Coating Fire Water Storage Tanks With NSF 61 Certificaitons
Center Enamel is the largest supplier of glass fused to steel tanks (GFS Tanks) in Asia. With more than 30 years of experience, our enamel coating fire water tanks are supplied for industry, commercial and municipal applications. Over 10000 tanks built all over the world successfully, Center Enamel's Glass-Fused-to-Steel tanks engineering design meet or exceed AWWA D103-09 and EN/ISO28765:2011, and our GFS tank engineers make tank engineering calculation on each specific tank structure according to project local environmental conditions, such as snow load, wind speed, seismic zone etc., to make sure the tank structure's adequate security in long-term service life.
The combination of steel hardness and glass anti-corrosion provides the assurance that excellent corrosion resistance and more than 30 years of service life. Under 850 degrees Celsius high-temperature fusion, the glass are fused onto the surface of steel perfectly with the result of durable finish.
Why GFS Fire Water Tank?
Center Enamel’s Glass fused to steel tanks are manufactured in its factory, which already passes ISO9001 - 2008 quality certification system. All the glass fused to steel sheets is enamel coated / glass fused at more than 850 degrees Celsius temperature fusion. Comparing to other tanks, like concrete tanks, welded steel tanks, GFS fire water tanks are easy to install and construct, and it takes even less than 15 days for construction. Perfectly fusion of glass and steel, our glass fused to steel fire water tanks can resist PH range from 1 to 14, service life even more than 30 years!
Enamel Coating Fire Water Storage Tanks Specifications
Coating color | dark blue, dark green, white, and customized |
A standard steel plate size | effective size 2400mm x 1200 m |
Steel plates thickness | 3mm - 12mm, depends on the diameter & height |
Coating thickness | 0.25mm - 0.4mm, two coatings internal and external |
Acid and alkalinity proof | standard coating suits for PH3 - PH11, special coating suits for PH1 - PH14 |
Adhesion | 3,450N/cm |
Elastic | same as steel sheet, around 500KN/mm |
Hardness | 6.0 Mohs |
Service life | >30 years |
Spark test | >1500 V |
Permeability | gas and liquid impermeable |
Easy yo clean | smooth, glossy, inert, anti-adhesion |
Corrosion resistance |
excellent! Suitable for wastewater salt water, seawater, high sulfur crude oil, salt fox, organic and inorganic compounds |
Application and Featured Projects
1. Fire-Water Tank
2. Waste Water Treatment Project
3. Waste To Bio-Energy Project
4. Portable and Drinking Water Storage
5. Grain and Dry Bulk Storage
1. Sewage Treatment:
2008 Beijing Olympics Games Waste Water Reconstruction and Extension Project
Project Description:
4 sets of sedimentation tanks Ø18.33x3.6mH
1 set of mud collection tank Ø4.82x3.6mH
Total volume: 5200m3
Installation: 12 people, 15 days
2. Biogas Engineering
2010 Indonesia Palm Oil Mill Effluent Treatment Biogas Plant Project
Project Description:
3 sets of Ø19.86x8.4mH
Total Volume: 7800m3
Installation: 15 people, 20 days
3. Potable and Fire Water Tank
2009 Niger Daily Use Potable and Fire Water Storage Project
Project Description
2 sets of water storage tank Ø19.86x4.8mH
Total Volume: 2750m3
Installation: 12 people, 12 days